PERHAM RESOURCE RECOVERY FACILITY EXPANSION

This project is an expansion of an existing garbage incinerating facility to increase its capacity, and to provide a recycling component as a new service at the site.  This new program results in a three-phase project totaling 53,000 S.F. of new construction.  TDP is responsible for the shell building enclosures.

First completed was a conceptual level design comparing different construction systems for life cycle and construction costs.  This resulted in the Owner selecting the pre-cast concrete wall panel option, with standing seam metal roof.

The existing incineration building is a pre-engineered metal structure, so this same system was used in its addition.

A two story, 9,000 S.F. administrative office build out within the shell structure provides for offices, conference space, employee break room and locker / shower rooms.

This project was completed in early 2014.