PDC BUILDING – EXTERIOR LIFT DESIGN

Located in Brooklyn Park, MN

The split level design of this office/showroom building makes it very difficult to provide ADA compliant access. At this particular spot, a sloped walk was out of the question. We worked with the lift supplier and structural engineer to design the most cost effective solution. The lift is full exterior to the building, exiting onto an extension of the stair landing outside the entry door. At this location, the lower level was storage for another tenant.